Cerro Verde, Peru:

P&C completed preliminary through basic engineering for the tailings systems as part of the 240,000 tonne per day Cerro Verde Production Unit Expansion Project. The project included rheology test work and engineering design of new gravity tailings launders, a two-stage central cyclone station, and cyclone underflow pumping and pipeline system, and cyclone overflow gravity discharge pipelines.